<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=789673508300973&amp;ev=PageView&amp;noscript=1">
Skip to main content
Free checklist · 7 pages

The ETL Quality Gate Checklist

What to test at every hop, and how to stop a bad load before it reaches a report. For the data engineers and QA leads who own the pipeline.


What's inside

  • Tick-box checks for each hop: source, staging, warehouse, and reports
  • How to wire pass and fail into your orchestrator
  • How to promote tests through CI/CD with your code
  • A cadence table for what to run after every load, daily, and weekly

We'll email the checklist. No sales sequence unless you ask for one.


What to Test at Each Hop

A check at every hop tells you where a load broke, not just that it did. The checklist turns each hop into tick-box steps.

Source

Did the extract get everything?

Counts, totals, and the load window match the system it came from.

Staging

Did it land intact?

Keys are unique and never null, with no duplicate or truncated rows.

Warehouse or lake

Did the transformations hold?

Rules, joins, aggregates, and lookups produce what they should.

Reports and models

Did it change unexpectedly?

Key metrics, volumes, and null rates are compared to recent runs.


Who It's For

Data engineers

Building tests into each hop of the pipeline, and wiring them into the orchestrator.

QA leads

Deciding which checks run on every load, which run on a schedule, and which stop the pipeline.

Data platform owners

Keeping bad loads out of the reports and models the business depends on.

Want to see it in your pipeline? See how quality gates work →