<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=789673508300973&amp;ev=PageView&amp;noscript=1">
Skip to main content
Migration Validation Program · ETL, ELT and pipelines

ETL, ELT and Pipeline Migration Validation

The tables your old jobs produce, matched by the new ones, run after run.

Rebuilding SSIS packages, Informatica PowerCenter mappings, DataStage or Talend jobs, or years of stored procedures and SQL scripts as ELT in dbt, Coalesce, Databricks, or Snowflake? We run the old and new logic side by side on the same inputs and compare what each one produces, table by table and run by run, until your owners are ready to retire the old jobs.

Free first step

Mini Validation

  • 10 pipeline outputs you choose
  • Old and new job output compared, plus a re-check after fixes
  • Findings within 10 business days after we are connected
  • A fixed price for the parallel run, or a plan to run it yourself

How the Mini Validation works →


What Changes When ETL Logic Moves to a New Tool?

Rewritten logic is close, not identical. These are the places it drifts.

The old tool made decisions nobody wrote down

Which row a lookup returns when there are two matches. What a NULL does inside a concatenation. Whether trailing spaces get trimmed, and which rows go to a reject file. Rewritten SQL makes its own choices unless someone captured the old ones.

Types change quietly

An SSIS data flow or a stored procedure converts strings to dates and decimals to integers without being asked. dbt models and Snowflake procedures cast differently, so rounding, truncation, and padding shift values that a row count never notices.

Order matters more than it looks

Deduplication that keeps the first row depends on whatever sort order the old engine happened to use. Joins, window functions, and row-by-row updates in stored procedures can pick different survivors once the same logic runs set-based.

Day one looks fine

A full load usually matches. The differences show up later: an incremental window that skips late-arriving records, a job that starts before its upstream load finishes, a history row that closes a day early, a delete that never propagates.

The old code is the only specification

Mappings and procedures written fifteen years ago, by people who have left, hold the business rules. Comparing outputs is often the only practical way to prove the rewrite kept them, and to catch the rules someone changed on purpose.


What Does ETL and Pipeline Migration Validation Compare?

We test what each job produces, not the code. The old logic might live in SSIS, Informatica, DataStage, Talend, Oracle Data Integrator, or stored procedures, and the new logic in dbt models, Coalesce nodes, Databricks jobs and notebooks, or Snowflake tasks and procedures. Either way the results land as tables, files, or extracts, and that is where we compare them. No connector to the ETL tool is needed.

LayerWhat we check
Full-load outputThe first full run of the new jobs produces the same rows and values as the old ones
Every scheduled runEach incremental or scheduled run matches the old job's run on the same inputs and load window
Transformations and business rulesDerived columns, lookups, aggregations, and rule-driven flags match, including NULLs, blanks, padding, and rounding
History behaviorSlowly changing dimensions open and close records on the same dates, with the same versions
Late, corrected, and deleted recordsLate-arriving and corrected records, deletes, and rejected rows are handled the same way on both sides
Row levelEvery column, matched by key, on the outputs your owners name as critical

Planned changes go into the acceptance rules up front, so the results show only what needs a decision.

Ab Initio, SAP Data Services, scheduled Python, or something home-grown? The method is the same: we compare outputs. Tell us in your Mini Validation request →

Testing ETL jobs that are not moving? See ETL Testing & Monitoring →

For engineers

Migration Validation GuideThe step-by-step method behind the program.

How Does ETL and Pipeline Migration Validation Run?

Five steps, from a free Mini Validation to the signed evidence pack.

1

Mini Validation

Pick 10 pipeline outputs. Within 10 business days after we are connected, you see where the rewrite stands and get a fixed price for the rest.

2

Plan

We agree on which outputs are in scope, the acceptance rule for each, and who signs.

3

Build

We connect to both sets of outputs and generate comparisons from your list of tables, files, and keys.

4

Parallel run

Through the parallel run, each scheduled run is compared, old output against new, with differences sorted by likely cause.

5

Sign-off

When the outputs hold steady, the Sign-off Evidence Pack goes to your owners and the old jobs can be retired.

Documented customer results
2,300tables tested in a single week
12critical defects found across 20,000 columns
26months with zero reported data issues

What Does ETL and Pipeline Migration Validation Cost?

Every Migration Validation Program has a fixed price, set after the Mini Validation. The example shows where a common scope lands. The estimator gives you a figure for your own numbers in about a minute.

Typical starting estimate

From $10,000

Up to 25 pipeline outputs, row-by-row matching up to 100 million rows, 3 validation cycles, and 3 months of platform access. The Data Agent is included.

Example: SSIS to dbt

About $20,000

60 pipeline outputs, a 4-week parallel run, 4 months of access.

About 6 to 9 weeks

Estimate your price → Above $150,000, a sales executive scopes the work with you.


ETL, ELT and Pipeline Migration Validation FAQ

Short answers to what migration leads ask first.

How do you validate an ETL or ELT migration?

Run the old and new jobs side by side on the same inputs and compare the tables they produce, not the code: a full-load comparison first, then every scheduled run through the parallel run, with transformations, history, deletes, and rejected rows checked. Logic you changed on purpose goes into the acceptance rules up front.

Which ETL and ELT tools does this cover?

Any tool whose results land somewhere Validatar can read. Common moves are SSIS, Informatica PowerCenter, DataStage, Talend, Oracle Data Integrator, and stored procedures rebuilt in dbt, Coalesce, Databricks, or Snowflake.

Do you test the dbt or Coalesce code?

No. We test what the code produces. dbt models, Coalesce nodes, Databricks jobs, and Snowflake procedures all write tables, and that is where we compare them.

What about stored procedures?

Procedures are often the hardest logic to read, which makes output comparison the practical test. We run the old procedure and its replacement against the same inputs and compare the rows each one writes, updates, or deletes.

How long should the parallel run be?

Long enough to cover month-end and any weekly or monthly jobs, usually four weeks. One validation cycle covers a week of scheduled runs.

What does ETL and pipeline migration validation cost?

The Migration Validation Program starts at $10,000 and is priced by scope. For example, 60 SSIS outputs over a 4-week parallel run comes to an estimated $20,000. Your fixed price comes after the Mini Validation.

Related solutions

Cloud Migrations ETL Testing & Monitoring Warehouse and database migrations BI and reporting migrations

Prove the New Jobs Before You Retire the Old Ones

Start with a free Mini Validation on 10 pipeline outputs. We'll compare what the old and new jobs produce, show you every difference, and give you a fixed price to finish the parallel run.

Book a Free Mini Validation Estimate Your Price

Free, with no obligation to go further.

Still planning your migration? Get the Migration Validation Checklist →